|
Location:
Tam Nong
industrial
zone has
total
land
areas is
113ha,
located
in the
West of
Phu Tho
province,
30km
from
Viet Tri
city,
and 3km
from
Phong
Chau
bridge
on the
route of
32C
National
highway,
Connecting
Ha Noi
with
Northwest
and
Northeast
province,
and it
takes
1km to
Ho Chi
Min
highway.
Infrastructure:
Transportation
and
traffic:
Internal
traffic
of
Industrial
zones
has been
planned
and
designed
connect
with
National
highway
32C.
Waste
water
and rain
drainage
system:
has been
planned
to built
in two
separates
system,
Enterprises’
waste
water
need to
meet C
standard
- TCVN
5965
before
flowing
into
treatments
system
of
industrial
zones.
Electricity
supply
system:
by this
time
there
are 35KV
line,
and in
future
there
plan to
build a
transformer
with
2x16KVA,
internal
electricity
network
of
Industrial
zones is
design
with
closed
net.
Water
supply
system:
water
supply
from a
water
factory
near Bua
River,
the pine
line is
constructed
to
particular
factory
and
closed
net.
Tele-communication
system:
meet
requirement
for
nation
and
international
communication.
Priority
Project
to
invest:
manufacture
and
assembly
machinery,
ago and
forestry
processing,
production
warehouse,
garment
and
textile,
deluxe
construction
material,
mineral
processing.
|